Record · nrc.gov
https://www.nrc.gov/about-nrc/news-releases/2026/26-079
nrc.gov
A page on nrc.gov, which corpus.blog does not hold as a blog, is cited by 1 distinct blog to date (corpus.blog, measured 9 October 2026).
A record is what was published and who pointed at it. corpus.blog does not hold this page -- read it at the source, or at its Wayback capture.
1blog citing
| Period | Blogs | Links |
|---|---|---|
| All time | 1 | 2 |
| Last 90 days | 1 | 2 |
| Last 30 days | 1 | 2 |
| Last 7 days | 1 | 2 |
| First cited | 2 Oct 2026 |
|---|---|
| Latest citation | 3 Oct 2026 |
| Anchor phrases | 1 |
How it is described
The words blogs link this page with, by how many different blogs use them.
- https://www.nrc.gov/about-nrc/news-releases/2026/26-0791 blog
Cited by 1 blog in 2 posts
One row per blog, the most recently citing first. Each shows the blog's newest citing post; open a row for the others.
Blog
Newest citing post
Date
energycentral.com2 posts
TVA Gets NRC Construction Permit for 300 MWe SMR at Clinch River Site
linked as “https://www.nrc.gov/about-nrc/news-releases/2026/26-079”
Read at the source (opens in a new tab)3 Oct 2026
1 other post
TVA Gets NRC Construction Permit for 300 MWe SMR at Clinch River Site
linked as “https://www.nrc.gov/about-nrc/news-releases/2026/26-079”
Read at the source (opens in a new tab)2 Oct 2026
Something wrong with this page’s record? Report a problem with nrc.gov/about-nrc/news-releases/2026/26-079